BACKGROUND
Alaska Aerospace (AAC) requires a helicopter to pass over and surveil area surrounding the Pacific Spaceport Complex-Alaska (PSCA) during the duration of a mission window. Any changes in the schedules will be coordinated closely between the Operations Director and the Contractor.
REQUIREMENTS
The Contractor shall support two (2) pass overs for the anticipated launch window. A successful launch may result in reduced days of support currently anticipated. This support entails the contractor performing the first pass over three (3) hours before the launch (T-0) and the second 1.5 hours before launch (T-0). For environmental purposes, Alaska Aerospace may require additional flight time to assist in the transportation of a qualified AAC employee to take pictures of seals surrounding the Ugak bay to ensure no disturbance has been made to the surrounding wildlife during the launch, along with a potential touch down to support stationary cameras also located on Ugak island.
Helicopter on site: T-4
Passover 1: T-3
Passover 2: T-1.5
(Potential) Environmental Passover(s)